When the wall-part is removed from a stone tile, there is a 25% chance that a single stone (also known as a boulder) will be left behind. The opposite corner can also be placed on a different z-level with c/ e, designating areas across z-levels for mining. An area should now be highlighted, indicating the area to be mined. Tiles with first/lowest numbered priority value will be mined first.
0 Comments
Leave a Reply. |